The minutes and annexes for the first EGSIEM Project Meeting, held in Bern on the 11. & 12. June 2015 are available from the links below.
EGSIEM Project Meeting Minutes (Link)
Annex 2 Action Items Status & Upcoming Deliverables (Link)
Annex 4 K-Band data screening and noise study (Link)
Annex 5 Preparation of NEQs & Product Proposal (Link)
Annex 6 FES 2014: a new global tidal model (Link)
Annex 7 Simulated recovery of various hydrological signals using real GRACE data at CNES (Link)
Annex 8 Acceleration Approach (Link)
Annex 9 Status/Plans GFZ RL05a/RL06 (Link)
Annex 10 3rd reprocessing campaign (Link)
Annex 11 Establishment of a consistent reference frame (Link)
Annex 12 Validaton with GNSS loading (Link)
Annex 13 Compilation of representative historical flood situations (Link)
Annex 14 WP3 Validation by Ocean Bottom Pressure (Link)
Annex 15 SINEX and Gravity Field Parameters (Link)
Annex 16 Level-3 Products (Link)
Annex 18 NRT at TUG – Status and Plans (Link)
Annex 19 Status & Plans (Link)
Annex 20 Hydrological Service (Link)
Annex 21 Flood Mapping – from semi-automatic tools to fully automatic Services (Link)
Annex 22 Dissemination & Exploitation (Link)